Si necesitas completar
en espanol pulsa aqui

Daily Stationary Scaffold Inspection

 
 
 
 
Scaffold components and planking in safe condition for use and planks graded for scaffold use
 
Frame spacing and sill size capable of carrying intended loading
 
Competent person in charge of erection and to inspection
 
Sills properly placed and adequate sized
 
Screw jacks been used to level and plumb scaffold instead of unstable objects
 
Base plates and/or screw jacks in firm contact with sills and frame
 
Scaffold is level and plumb
 
Scaffold legs braced with braces properly attached
 
Guard railing in place on all open sides and ends
 
Overhead protection or wire screening been provided where necessary
 
Scaffold been tied to structure at least every 30' in length and 26' in height
 
Free standing towers been guyed or tied every 26' in height
 
Brackets, tube and clamp, and accessories been properly placed with nuts and bolts tightened
 
Scaffold free of makeshift devices or ladders to increase height
 
Planks have minimum 12" overlap and extend 6" beyond supports
 
Toe boards properly installed
 
No forward fall hazards presents (large openings on building)
 
Conditions such as power lines, wind loading, etc. controlled
 
Safe access to scaffold without climbing on cross braces
 
Front face within 14 inches of the work or within three feet for outrigger scaffolds
 
 
 

 
 
 

 
Please wait.
Processing...